Out of brackets. Back to the machine shop - mill & drill.
Cabling done for all the installed semaphore servos and semaphore lights. Wiring documented in signals database.
Got up to 40°F on the porch, warm enough to cut more materials. Final(?) cut of servo arms and brackets. And cut material for a monitor bracket version 2.0.