• Upgraded the favicon(s) for the website. ho hum. Then I had a better idea.
  • Installing semaphore brackets. Though of a way to fix signal tower holes that are too large.
  • Ordered tools to make the monitor bracket nicer.
  • Out of brackets. Back to the machine shop - mill & drill.
  • Cabling done for all the installed semaphore servos and semaphore lights. Wiring documented in signals database.
  • Got up to 40°F on the porch, warm enough to cut more materials. Final(?) cut of servo arms and brackets. And cut material for a monitor bracket version 2.0.